Traditional Framing for Lasting Home Construction
Stick Frame Houses in Spokane for homeowners building ranch, craftsman, or fully custom floor plans
MJ Construction Services, LLC specializes in traditional stick frame home construction throughout Spokane, serving families who want proven building methods, design flexibility, and long-term structural integrity. You choose your floor plan, and we deliver precision framing, proper load distribution, and careful craftsmanship from foundation to roofing.
Stick-built homes use dimensional lumber to create walls, floors, and roof systems that are assembled on-site, allowing for endless customization in layout, ceiling height, window placement, and room configuration. This method supports energy-efficient insulation, modern HVAC systems, and finish materials that match your style and budget. We coordinate permits, material delivery, inspections, and subcontractors so construction stays organized and on schedule.
Contact MJ Construction Services to discuss your property, timeline, and design preferences for stick frame construction in Spokane.
How Stick Frame Construction Works
Your project starts with a foundation, followed by floor joists, wall framing with studs spaced sixteen or twenty-four inches on center, and roof trusses or rafters engineered to handle Spokane's snow loads. Sheathing goes over the frame, then house wrap, windows, and exterior siding or stone. Interior work includes insulation, electrical and plumbing rough-ins, drywall, and finish carpentry.
When the project is complete, you move into a home with square walls, level floors, properly sealed windows, functioning systems, and a roof built to shed snow and rain without sagging or leaking. Every board is nailed according to code, every corner is braced, and every structural connection has been inspected.
We use kiln-dried framing lumber, engineered beams where spans require additional support, and galvanized fasteners to prevent rust in wall cavities. Stick framing allows for vaulted ceilings, complex rooflines, and future additions without compromising structural integrity. Build time depends on square footage, site access, and weather, but most homes take several months from framing to final finishes.

Questions That Come Up Before Starting
Clients building stick frame homes often want to know how the process differs from other methods, what affects cost, and how long framing takes once the foundation is ready.
MJ Construction Services builds stick frame homes throughout Spokane with the same commitment to quality materials, clear timelines, and honest service that guides every project we take on. Reach out to discuss your floor plan and construction goals.
